Past exam question: 2081 Chaitra (Regular), Q3(a)
Open in the Padhaiko appPrepare a proposal for construction of a public library building in your local town to be submitted to the Mayor of the concerned municipality. Show only the title page, abstract and cost estimate sections of the proposal.
Solution
Planning and Proposal Format:
- Document Type: Technical Infrastructure Construction Proposal.
- Recipient: The Mayor, Lalitpur Metropolitan City Office, Lalitpur, Nepal.
- Submitting Entity: Community Infrastructure Development Committee in association with Civil & Architectural Consultants.
- Tone: Formal, civic-minded, persuasive, and technically precise.
- Required Sections:
- Title Page: Full project designation, submission metadata (recipient, submitting body, date, reference).
- Abstract: High-level overview of the civic need, proposed two-story library facility (reading halls, digital research center, children's corner, community meeting room), construction timeline, and economic summary.
- Cost Estimate: Itemized engineering cost estimation table detailing civil works, structural materials, electrical/networking, interior furnishing, and statutory contingency reserves (in Nepalese Rupees).
Complete Model Proposal Sections:
TECHNICAL AND FINANCIAL PROPOSAL ON:
THE PLANNING, DESIGN, AND CONSTRUCTION OF A MODERN CIVIC PUBLIC LIBRARY BUILDING AT WARD NO. 5, LALITPUR
Submitted To:
The Mayor
Lalitpur Metropolitan City Office
Pulchowk, Lalitpur, Bagmati Province, Nepal
Submitted By:
Civic Engineering & Architectural Consultants Pvt. Ltd.
In Collaboration With:
Patan Community Educational Development Committee, Lalitpur
Date of Submission: April 10, 2025
Proposal Reference No.: LMC/INFRA-LIB/2081-01
ABSTRACT
Access to equitable public learning spaces and digital information repositories is a vital cornerstone of municipal development. This proposal outlines the comprehensive plan for the design, construction, and commissioning of a two-story, earthquake-resistant Public Library Building at Ward No. 5, Lalitpur, on 10 aana of municipality-owned land. The facility is architecturally planned to accommodate 200 readers simultaneously, featuring a traditional Newari brick-facade aesthetic harmonized with modern RCC framed engineering.
Key facilities include a ground-floor general reference hall and children's interactive learning section, a first-floor digital library with 40 high-speed networked terminals, an open study terrace, and universally accessible ramp and restroom facilities. The total project duration is estimated at 12 calendar months from ground-breaking to handover, requiring a total capital investment of NPR 28,500,000 (inclusive of VAT and physical contingencies). Once operational, the library will foster inclusive literacy, provide youth research facilities, and serve as an educational landmark for the city.
COST ESTIMATE
The itemized cost breakdown for the construction and furnishing of the proposed public library building is based on current District Rate Analysis Norms of Lalitpur Metropolitan City:
| S.N. | Work Component / Description | Estimated Amount (NPR) |
|---|---|---|
| 1 | Site Clearance, Earthwork Excavation & Foundation Works | 2,200,000 |
| 2 | RCC Framed Superstructure (Columns, Beams, Slabs, Rebar) | 9,800,000 |
| 3 | Brick Masonry, Plastering, Painting & Waterproofing | 4,100,000 |
| 4 | Traditional Wooden Windows, Doors & Glazing Works | 2,300,000 |
| 5 | Electrical Installation, Solar Backup & High-Speed LAN Cabling | 2,800,000 |
| 6 | Sanitary Plumbing, Water Storage, Rainwater Harvesting & Septic System | 1,600,000 |
| 7 | Interior Library Furnishing (Racks, Study Carrels, Modular Desks, Counters) | 2,500,000 |
| 8 | Sub-Total Civil & Interior Works | 25,300,000 |
| 9 | Physical Contingencies (5%) | 1,265,000 |
| 10 | Municipal Quality Assurance, Testing & Site Supervision (3%) | 759,000 |
| 11 | VAT & Statutory Compliance Reserves | 1,176,000 |
| Grand Total Estimated Cost | 28,500,000 |
In Words: Nepalese Rupees Twenty-Eight Million Five Hundred Thousand Only.
The proposal contains the three requested components:
- Title Page: Complete municipal submission header addressing the Mayor of Lalitpur Metropolitan City.
- Abstract: An executive summary articulating the educational need, two-story RCC library layout (digital room, reading halls, accessibility), 12-month timeline, and total financial outlay.
- Cost Estimate: A transparent, itemized engineering bill of quantities dividing the NPR 28,500,000 budget across excavation, superstructure, finishes, MEP installations, interior furnishings, and contingency reserves.